Dominion Energy
VA
94
stress
IRP
Filed 10/2024 — doubled DC load forecast to 40GW by 2039Rate Case
Pending — 9.4% ROE requestProcurement
5GW solar, 3GW gas, 1GW SMR explorationConstraints
Substation transformer lead times 4+ yearsEntergy
LA/MS/AR/TX
88
stress
IRP
MISO South IRP — Meta/AWS load triggered 6GW gas expansionRate Case
Approved LA 8.95% ROEProcurement
Orange County 1.5GW CCGT, Richland Parish PPAConstraints
Gas turbine delivery 2027+Duke Energy
NC/SC/FL/IN/OH/KY
78
stress
IRP
Carolina IRP — 10GW gas + nuclear extensionRate Case
Active NC + INProcurement
Marshall coal-to-gas; SMR siting studyConstraints
NC permitting bottleneckAmeren
MO/IL
72
stress
IRP
Refiled 2025 — added 4GW gas + 2.4GW renewablesRate Case
MO approved 9.85% ROEProcurement
Castle Bluff CCGT, McKinley windConstraints
Transformer / interconnection backlogDTE Energy
MI
68
stress
IRP
Approved 2024 — coal retirement acceleratedRate Case
Pending — distribution modernization riderProcurement
Trenton Channel solar, Belle River gas conversionConstraints
Distribution capex tradeoffOncor
TX
86
stress
IRP
T&D operator — $36B 5-yr capex planRate Case
Settled 2024 — 9.7% ROEProcurement
n/a (wires-only)Constraints
ERCOT generation queue, transformer shortageCenterPoint Energy
TX/IN/MN/OH
70
stress
IRP
TX Resiliency Plan $5.7BRate Case
TX approved 2025Procurement
Houston-area peakersConstraints
Hurricane resiliency capex competing with loadGeorgia Power
GA
76
stress
IRP
2025 update — 8.2GW new load by 2030Rate Case
Pending — Vogtle cost recoveryProcurement
Yates CCGT, Plant Bowen extensionConstraints
Coal retirement timingAEP
Multi-state
82
stress
IRP
Ohio + Indiana — 15GW DC load forecastRate Case
Multi-jurisdictional activeProcurement
Indiana CCGT, OH transmission upgradesConstraints
Generation / transmission concurrencyXcel Energy
MN/CO/TX/NM/WI
71
stress
IRP
CO Clean Energy Plan, MN integrated distributionRate Case
CO + MN activeProcurement
Sherco solar, Comanche retirement planConstraints
Coal closure cadence vs DC load