Phase 43 · National Twin

National Infrastructure Twin

A live digital twin of U.S. transmission, generation, fiber, pipelines, rail, and industrial assets — overlaid with AI load growth simulation.

Layers Active
10
Mean Coverage
96%
Mean Stress
48
Simulations Running
14
congestion · gap · corridor
Layer Stack

Infrastructure Layers

overlay-ready

Transmission Lines

612,000 mi
Coverage
Stress 68

Substations

82,400
Coverage
Stress 71

Long-Haul Fiber

1.2M mi
Coverage
Stress 22

Gas Pipelines

305,000 mi
Coverage
Stress 54

Class I Rail

140,000 mi
Coverage
Stress 18

Interstate Highway

47,800 mi
Coverage
Stress 12

Generation Assets

12,400
Coverage
Stress 76

Renewable Assets

8,900
Coverage
Stress 31

Data Centers

5,400
Coverage
Stress 84

Industrial Facilities

31,200
Coverage
Stress 42
Simulation

AI Load Growth Overlay · 2025-2030

→ PJM aggregate load: +38 GW (2030) · reserve cliff Q3 2027
→ ERCOT: +62 GW · West Zone constrained summer 2026
→ MISO Central: +22 GW · queue reform tailwind
→ Strategic corridors identified: I-20 East TX · I-35 Central · SE Reshoring Belt