Tracked Projects
8
across 5 ISOs
Withdrawn
2
reclaimable slots
Avg Queue Wait
27 mo
all status
Aggregate Capacity
4.8 GW
under tracking
22.1
Queue Withdrawal Tracker
| ISO | Project | MW | Status | Position | Wait | County |
|---|---|---|---|---|---|---|
| PJM | Loudoun Solar+Storage 850 | 850 | ● Withdrawn | #412 | 38mo | Loudoun, VA |
| PJM | Prince William DC Load 600 | 600 | ● Delayed | #287 | 44mo | Prince William, VA |
| ERCOT | Abilene Wind Repower | 320 | ● Suspended | #91 | 22mo | Taylor, TX |
| MISO | Cedar Rapids Industrial 1.2GW | 1200 | ● Active | #18 | 14mo | Linn, IA |
| PJM | Manassas Park 480 | 480 | ● Withdrawn | #333 | 36mo | Prince William, VA |
| ERCOT | Hood County Storage 200 | 200 | ● Active | #64 | 18mo | Hood, TX |
| MISO | Story County DC Park | 750 | ● Delayed | #142 | 30mo | Story, IA |
| SPP | Lincoln Industrial 400 | 400 | ● Active | #22 | 12mo | Lancaster, NE |
22.2
Opportunity Engine
PJM · Loudoun, VA
Loudoun Solar+Storage 850
Withdrawn
Substation tie-in reusable
850MW·queue #412·38mo wait
PJM · Prince William, VA
Prince William DC Load 600
Delayed
Replacement slot likely Q3
600MW·queue #287·44mo wait
ERCOT · Taylor, TX
Abilene Wind Repower
Suspended
Underutilized 345kV corridor
320MW·queue #91·22mo wait
PJM · Prince William, VA
Manassas Park 480
Withdrawn
Abandoned position — claimable
480MW·queue #333·36mo wait
MISO · Story, IA
Story County DC Park
Delayed
Permit-ready land 4mi away
750MW·queue #142·30mo wait
22.3
Transmission Stress (Heat Index)
PJM Dominion Zone92% loaded
ERCOT North84% loaded
MISO Zone 367% loaded
SPP Central51% loaded
CAISO SP1573% loaded