LIVE
Phase 22

Queue & Transmission Intelligence

Track interconnection bottlenecks. Identify abandoned queue positions, underutilized substations, and transmission-rich corridors.

Tracked Projects
8
across 5 ISOs
Withdrawn
2
reclaimable slots
Avg Queue Wait
27 mo
all status
Aggregate Capacity
4.8 GW
under tracking
22.1

Queue Withdrawal Tracker

2 reclaimable positions
ISOProjectMWStatusPositionWaitCounty
PJMLoudoun Solar+Storage 850850Withdrawn#41238moLoudoun, VA
PJMPrince William DC Load 600600Delayed#28744moPrince William, VA
ERCOTAbilene Wind Repower320Suspended#9122moTaylor, TX
MISOCedar Rapids Industrial 1.2GW1200Active#1814moLinn, IA
PJMManassas Park 480480Withdrawn#33336moPrince William, VA
ERCOTHood County Storage 200200Active#6418moHood, TX
MISOStory County DC Park750Delayed#14230moStory, IA
SPPLincoln Industrial 400400Active#2212moLancaster, NE
22.2

Opportunity Engine

5 actionable signals
PJM · Loudoun, VA
Loudoun Solar+Storage 850
Withdrawn

Substation tie-in reusable

850MW·queue #412·38mo wait
PJM · Prince William, VA
Prince William DC Load 600
Delayed

Replacement slot likely Q3

600MW·queue #287·44mo wait
ERCOT · Taylor, TX
Abilene Wind Repower
Suspended

Underutilized 345kV corridor

320MW·queue #91·22mo wait
PJM · Prince William, VA
Manassas Park 480
Withdrawn

Abandoned position — claimable

480MW·queue #333·36mo wait
MISO · Story, IA
Story County DC Park
Delayed

Permit-ready land 4mi away

750MW·queue #142·30mo wait
22.3

Transmission Stress (Heat Index)

modeled congestion
PJM Dominion Zone92% loaded
ERCOT North84% loaded
MISO Zone 367% loaded
SPP Central51% loaded
CAISO SP1573% loaded